Engineer & Permit

FloodReady prepares the engineering, code documentation, and permit package required to support authority review of flood mitigation design.

Flood protection system design drawings prepared for permitting, structural review, and regulatory approval.

PE-Led Design.
Permit-Ready Documentation.

Flood mitigation permits require more than product data. They require defined design criteria, load calculations, egress and access considerations, solution selection aligned with applicable requirements, structural coordination, reviewer-ready documentation, and clear responses to authority comments.

Prepared for the Upcoming ASCE 24-24 Compliance Standard?

  • Stringent flood mitigation requirements

  • Higher cost and schedule impacts

  • Updated Insurance renewal requirements

FloodReady helps commercial and essential facilities prepare flood mitigation permit packages aligned with applicable FEMA, ASCE, NFIP, local building code, and product testing requirements.

Our engineering and permit documentation addresses the issues that often drive review comments: performance, constructability, egress, deployment, and long-term readiness.

What We Deliver


Engineering Design Basis

We define the flood mitigation design basis, including flood exposure, design elevation assumptions, opening conditions, structural constraints, facility operations, and applicable code criteria.


Flood Solution Selection

We evaluate and select deployable barriers, flood doors, flood gates, and automatic passive barriers based on opening type, flood depth, access, deployment requirements, tested ratings, operational use, Flood Design Class, and occupancy.


Load and Compliance Analysis

We address flood loads, buoyancy/uplift, anchorage requirements, substrate conditions, load transfer, accessibility, egress, signage, storage, and other code-related considerations affecting the design and permit package.


Required Plan Documentation

We prepare permit-ready documentation, including drawings, opening schedules, product data, calculations, testing documentation, deployment notes, and required supporting plans.


Permit Package Development

We prepare required plan documentation, including flood emergency operations, life safety, inspection, and maintenance planning, based on selected flood mitigation solutions, flood warning standards, and municipality requirements.


Authority Review Support

We support the permitting process through responses to reviewer comments, clarification drawings, revised documentation, and coordination with the applicable authority having jurisdiction.


For project-specific questions, permitting considerations, or scope clarification.

Additional Scope Support

Design-Assist, Procurement and Bid Support

FloodReady supports architects, contractors, owners, and institutional teams during early design, budgeting, and procurement. We help define flood mitigation scope, evaluate solution options, prepare bid-level technical requirements, and support coordination before final engineering and permit documentation.

For institutional and public-sector projects, we can support bid preparation with technical narratives, solution criteria, opening schedules, and permit-related documentation requirements.

Typical PE-Led Permit Deliverables

Engineering, documentation, and supporting materials vary by project scope, facility conditions, selected solutions, and authority requirements.

  • Project Integration Drawings

  • Product shop drawings and engineering documentation

  • Structural anchorage plans and details

  • Updated Certified Elevation Certificate coordination, where required

  • Flood load design analysis report, based on applicable ASCE criteria

  • Product testing and certification documentation

  • Facility Flood Emergency Operations / Life Safety Plan

  • Facility Inspection Plan

  • Facility Maintenance Plan

  • Permit support letters, narratives, and supplemental reports, where required

* Deliverables vary by project scope, facility conditions, selected flood mitigation solutions, authority requirements, and contractual scope.

Engineering-Led Approach

During this phase, site conditions, flood exposure, design criteria, solution selection, and permitting assumptions are organized into a reviewer-ready technical package. Viable approaches and permitting pathways are established before advancing to procurement and site integration.